Complete painting systems for custom homes, additions and major renovations—from new drywall and primer through walls, ceilings, trim, doors, millwork and final touch-ups.
Full interior painting of a large, newly renovated Alpine estate — every wall, ceiling, trim piece and door — plus every wallcovering in the home hung by our crew, including grasscloth and hand-painted panels.
A Coordinated Painting System for the Entire Project
New construction painting requires more than applying finish coats. New drywall, woodwork, trim, doors and specialty architectural details each require the correct preparation, primer and application method.
All Time Paint & Plaster Co. works with homeowners, builders, designers and general contractors to coordinate painting with the overall construction schedule and deliver a consistent finish throughout the property.
Preparation · Haworth, NJCompleted · Haworth, NJ
Who We Work With
New Homes, Additions and Major Renovations
01
Custom Homes
Complete interior and selected exterior painting for newly built custom residences.
02
Major Renovations
Painting for remodeled properties where walls, ceilings, trim and architectural elements are being rebuilt or replaced.
03
Additions
Painting systems for new living areas, kitchens, primary suites, basements and other additions.
04
Builder and Designer Projects
Coordinated painting for builders, designers and general contractors requiring clear scopes, scheduling and finish selections.
What We Paint
New Construction Painting Services
01
New Drywall
Primer and finish systems for walls and ceilings after the drywall has been accepted as ready for painting.
02
Ceilings
Standard, vaulted, tray, coffered and detailed architectural ceilings.
03
Walls
Finish systems selected according to room use, design and durability requirements.
04
Trim and Moldings
Baseboards, crown molding, casings, panel molding and detailed architectural trim.
05
Interior Doors
Preparation, priming and finish painting for new doors and frames.
06
Built-Ins and Millwork
Painted shelving, wall paneling and architectural woodwork where included in the project scope.
07
Staircase Components
Risers, skirts, balusters and other painted staircase elements.
08
Exterior Surfaces
Selected new-construction exterior siding, trim, doors and architectural details when included in the project.
The quality of the finished paint reflects the condition of the surface beneath it. Before painting begins, new drywall, trim, doors and millwork should be evaluated for readiness.
Surface preparation · Haworth, NJ
Review items may include
Drywall finishing consistency
Sanding marks
Joint visibility
Fastener imperfections
Corner-bead condition
Surface contamination
Gaps in trim and moldings
Nail holes
Wood-filler repairs
MDF edges
Previously applied primers
Moisture conditions
Lighting that reveals surface defects
Drywall installation and finishing are separate construction scopes unless specifically included in our written estimate. Painting does not automatically correct framing, drywall or carpentry defects.
Level 5 finishing, skim coating and extensive surface correction are available when specified and priced as part of the project.
Systems Selected by Surface
Primers and Finishes for New Construction
01
New Drywall
A compatible drywall primer or surfacer is selected according to the specified finish and surface condition.
02
MDF and Wood Trim
Edges, joints, repairs and bare areas are prepared and primed with products appropriate for the material.
03
Stain Blocking
Specialty primers may be required for knots, tannins, water stains or other conditions.
04
Walls and Ceilings
Finish coatings are selected according to appearance, room use, washability and sheen.
05
Trim, Doors and Millwork
Durable enamel-type systems are used when appropriate. Spray application may be recommended for a smoother finish.
Primers, products and the number of coats are selected for each project's surfaces and specifications — not every project receives the same system.
Coordinated From Start to Finish
Our New Construction Painting Process
01
Plans and Scope Review
Review drawings, room schedules, included surfaces, finish selections and project requirements.
02
Site and Substrate Review
Inspect drywall, trim, doors and other surfaces for painting readiness.
03
Protection and Coordination
Coordinate with other trades and protect completed floors, fixtures, cabinetry and adjacent finishes.
04
Priming and Surface Preparation
Prime included surfaces and complete agreed sanding, caulking, filling and surface correction.
05
Ceilings and Walls
Apply specified coating systems in the appropriate construction sequence.
06
Trim, Doors and Millwork
Complete the selected brush, roll or spray-finishing process for architectural woodwork.
07
Punch List and Final Walkthrough
Complete agreed touch-ups after construction activity and review the finished work.
Final touch-ups cover damage and corrections included in the agreed scope. Damage caused by other trades or work completed after painting may require a change order.
Project Coordination
Painting That Fits the Construction Schedule
New construction painting must be coordinated around drywall, millwork, flooring, cabinetry, electrical fixtures and final installations. We communicate with the project team so preparation, priming, finish coats and touch-ups occur in the correct sequence.
Builder and project-manager communication
Finish schedules
Color and sheen documentation
Room-by-room selections
Coordination with flooring and cabinetry
Protection of completed surfaces
Change-order documentation
Punch-list scheduling
Delays caused by other trades may affect painting sequencing and completion dates.
Protected staircase · Haworth, NJ
Featured Project
New Construction Interior Painting — Haworth, NJ
This newly constructed Haworth home received complete interior painting across walls, ceilings, trim, doors and detailed architectural spaces. Natural walnut elements were carefully sanded and protected with clear polyurethane to preserve their character alongside the painted finishes.
Large projects often require multiple wall colors, ceiling finishes, trim systems and specialty products. A documented finish schedule helps the homeowner, designer, builder and painting team remain aligned.
New construction projects are priced from plans, specifications, finish schedules and site conditions. Provide drawings and project details for a complete scope review.
When should a painter become involved in a new construction project?
Ideally during planning or before drywall is finished, so the painting scope, finish schedule and sequencing can be reviewed with the builder and other trades.
Do you work directly with builders and general contractors?
Yes. We work with homeowners, builders, designers and general contractors, and coordinate with the project manager on scheduling and finish selections.
Do you prime new drywall?
Yes. New drywall is primed with a compatible primer or surfacer selected for the specified finish and surface condition.
Do you provide Level 5 wall preparation?
Yes, when it is specified. Level 5 finishing, skim coating and extensive surface correction are included only when specified and priced in the written estimate.
Do you spray trim, doors and millwork?
On suitable projects. Spraying depends on the surface, site conditions and whether surrounding areas can be properly protected.
Can you paint while other trades are working?
Often, with coordination. We sequence preparation, priming, finish coats and touch-ups around other trades with the project team.View More Questions
How are colors and sheens documented?
With a room-by-room finish schedule listing surface, manufacturer, product, color, sheen, application notes and sample approval status.
Do you provide interior and exterior painting?
Yes. Interior painting and selected exterior surfaces such as siding, trim and doors can be included in a new construction scope.
How long does new construction painting take?
It depends on project scale, substrate readiness and trade coordination. We review the expected schedule as part of the scope review.
How are change orders handled?
Changes to the agreed scope, and damage outside the original scope, are documented separately before the additional work is completed.
What causes additional touch-up costs?
Damage from other trades, work installed after painting is complete, or scope changes may require additional touch-ups documented through a change order.
What information is needed for an estimate?
Plans, project location, estimated start date, square footage, ceiling heights, door and trim schedules, the finish schedule if available, included surfaces and current construction photos.
Send your project plans, current construction photos, location and estimated schedule. We'll review the scope and coordinate the next step with you, your builder or project manager.
Plaster, limewash and specialty finishes are our primary craft. Venetian plaster, limewash, Roman clay, tadelakt and microcement add depth and texture that paint alone cannot — on feature walls, fireplaces, bathrooms and more.